6th Floor
60 Gracechurch Street
London EC3V 0HR.
Video update from the Clogau St David’s Gold Mine and the processing of the high-grade Waste Tip.
#ClogauGoldMine #Gold #WelshGold
Video update:
https://youtu.be/2xF8svVunYY?feature=shared via @YouTube
In short:
– Exciting foothold in an emerging high-grade lithium province in the world-class Pilbara.
– Focus remains on gold production from Clogau.
More later in interview going out on http://lse.co.uk.
#Gold #CRMs
News today – option over highly prospective lithium licences. More updates soon.
Pleased to say that we’ve collected a large volume of fines material from the Waste Tip trenching programme. We’ve also been making a few adjustments to our processing plant to increase through-put volumes and recoveries. Now onto our next phase of work…
#ClogauGoldMine
Alba’s wholly-owned Inglefield Multi-Element Project is located in the same region in north-west Greenland as Alba’s Thule Black Sands and Melville Bay Iron projects, with the result that the Group benefits from significant logistical benefits and economies of scale during the summer field season.
Extensive historic exploration has reported the presence of cobalt, copper, gold, vanadium and nickel, and the potential for Inglefield to host a range of mineralisation styles, from copper-zinc volcanogenic massive sulphide (VMS), porphyry copper and iron oxide-copper-gold (IOCG) deposits.
Alba’s 2018 field work confirmed copper-gold-silver-molybdenum mineralisation at the Four Finger Lake target over a 500 metre zone. In 2019 Alba commissioned an independent geophysical data review which confirmed the IOCG prospectivity of the Four Finger Lake target. IOCG deposits are characterised by having very large tonnages at moderate grades.